Potain MC 310 K16 tower crane duo erects 1,410 ft bridge ...
2021-2-9u2002·u2002• The cranes are building the main section of the cable-stayed bridge with a total length of 1,410 ft (430 m), lifting thousands of tons of concrete and steel. • The bridge connects to nearly 4,934 ft (1,504 m) of elevated access viaducts on both sides. ETAC, the Potain sales and rental specialist based in Lima, leads the project's operations.
Get Price